QA

Quality Assurance Estimator

20 years of electrical construction experience. The last check before your estimate is delivered.

Experience

Our QA estimator brings 20 years of electrical construction experience to every review. They spent 12 years as a project manager and estimator for a commercial electrical contractor before moving into quality assurance. This background means they review estimates with a practical understanding of what happens in the field — not just what the drawings show.

Since joining the QA team, they have reviewed over 800 estimates and have identified an average of 4-6 discrepancies per estimate during the quality control process. The most common findings: omitted scope items from addenda, incorrect labor unit selection for non-standard conditions, and material pricing that did not reflect current supplier quotes.

QA Review Checklist

Quantities verified against plan set
All addenda incorporated
Labor units checked against NECA MLU
Pricing confirmed against supplier quotes
Scope letter matches bid documentation
Exclusions clearly documented
CSI MasterFormat divisions complete
Markup and profit margin confirmed

Standards Proficiency

  • NECA Manual of Labor Units (MLU) — current edition
  • RSMeans Electrical Cost Data — annual updates
  • NEC 2023 / 2026 — code cycle tracking
  • CSI MasterFormat 2024 — current edition
  • NFPA 70E — arc flash safety standards

Last reviewed: June 2026

FK Electrical Estimating

Professional, Fast, and Pinpoint Accurate Electrical Estimations Nationwide.

📍 5900 Balcones Dr, Austin, TX 78731

📞 Phone: (317) 751-5969

✉️ Email: fandkestimations@gmail.com

Ready to Submit Your Next Bid?

Upload your plans and we'll deliver a complete Division 26 material takeoff, labor calculation, and bid-ready cost summary within 48 hours. Flat-fee pricing, no hidden charges.

Share This Page

Twitter Facebook LinkedIn Email