ELECTRICAL
TAKEOFF WORKSPACE
QUANTITY VIEW
FROM THE SOURCE SCHEDULEMaterials. Measured.
—
01 / REVIEW THE SCOPE02 / TRACE THE QUANTITY
THE SAMPLE COLLECTION

An electrical estimate,
with the detail left in.

Choose a sample, then move through its measured scope. Project identities and commercial pricing are omitted.

Verified Takeoff Samples · Source-Based Estimates
Loading the verified quantity excerpts…
01Scope you can inspect

Categories come from the estimating schedule.

02Units that stay meaningful

Counts, lengths and areas remain separate.

03A route back to the source

Every selected item retains its cell reference.

Electrical material takeoff: actual quantity excerpts

These anonymized excerpts retain the published workbook descriptions, base quantities, units and drawing references. They show selected line items, not a complete project estimate. Prices, labor rates and client identities are omitted.

Multifamily electrical takeoff

Conduit, conductors and electrical distribution, organized by the source schedule.

48 published line items from 209 available source rows. The table shows one item per published category; explore the full published selection in the workspace below.

Review the quantity excerpt
Selected base quantities — Multifamily electrical takeoff
Material or assemblyQuantityUnitDrawing reference
3/4" Emt Conduit19870FTE 101 - 701
1-1/2" Emt Conduit195FTE 101 - 701
#12 Mc Cable3168FTE 101 - 701
#8 Awg Thwn/Thhn Cu195FTE 101 - 701
Electrode Grounding Conductor40FTE 101 - 701
1'-6" Wide Trenching For Underground Conduit275SFE 101 - 701
Panel Board MDP 1 1200 A 208/120 V 3 PH 4 W1EAE 602
150A 1P1EAE 602
Single Switch27EAE 101 - 701
D1 24vdc driver - alphabet of light - letters mini MANUF: Artemide MODEL: alphabet of light mini - n-o-v-a2EAE 101 - 104
12/2 Romex Cable For Lighting25095FTE 401 - 410
#6 Awg Ser Cable11280FTE 401 - 410

No verified companion drawing is published for this excerpt.

Commercial electrical takeoff

Electrical quantities selected from a multidisciplinary workbook.

29 published line items from 223 available source rows. The table shows one item per published category; explore the full published selection in the workspace below.

Review the quantity excerpt
Selected base quantities — Commercial electrical takeoff
Material or assemblyQuantityUnitDrawing reference
Panel Board L1 BUS AMPS: 125A Main Size/Type: MLO Volts/Phase: 208Y/120V 3P/4W AIC Rated: Fully Rated AIC Raitngs: FCA +10% Min1EAE401
1P-20A Circuit Breaker111EAE401
Provide Power For Emergency Shutoff Actuator To Water Valve1EAE101&E201
Duty Station3EAE101&E201
L38EM LED 2x2 Recessed Flat Panel LED 3000K,90CRI,3650LUM9EAE101
Provide Single Gang Box W/USB-C & Data Sleeve Above Ceiling W 10 Feet/100W Charging Cable Routed Door Jamb To Glass Mounted Tablet4EAE202
Allowance For All Conduits,Wiring & Dataport Cables1LSE101,201,202,401

2 anonymized drawing excerpts are available in the drawing viewer.

Read the units separately: FT records feet, EA records individual items and LS records a lump-sum allowance. A lump-sum row does not establish measured cable or conduit length. Base quantity, allowance and adjusted quantity remain separate in the interactive schedule. Source categories are retained; they do not replace the specification divisions in your project manual.

Electrical quantity takeoff services · Priced electrical estimates · Measurement methodology

Electrical bid examples: what to check before pricing

An electrical work estimate sample should help you trace the scope behind a price. The published excerpts here show measured quantities and source references; they are not complete priced bids.

  1. Reconcile the measured work. Check fixture and device counts against schedules, keep conduit and conductor units distinct, and identify any lump-sum allowance before applying rates.
  2. Agree the pricing inputs. A priced electrical construction estimate also needs material quotations, labor hours and rates, equipment requirements and the date of those inputs. Quantity rows alone do not establish an installation price.
  3. Review the bid boundaries. Record who carries demolition, controls, testing and other interfaces shown in the project documents. Keep base work, alternates and later addenda identifiable.

For your own bid, review the priced electrical estimating scope and confirm the required quantities, pricing and deliverables in the project quote.

YOUR NEXT BID

Bring the plans.
Let’s define the scope.

Tell us your trade scope, drawing set and bid date. We’ll confirm the estimating deliverables in your quote.

Request a similar estimate Explore commercial electrical estimating →

Cropped source drawing preview. Use zoom and scroll to inspect. Press Escape to close.

Drawing excerpt

100%
Anonymized cropped source drawing
⚡

FK Electrical Estimating

Electrical takeoff and estimating inquiries for construction bids.

📍 Remote project inquiries; availability confirmed when quoting

📞 Phone: Call Estimating Desk

✉️ Email: info@fkelectricalestimatings.com

Discuss your bid requirements

Provide the project city and state, current drawing revision, scope and deadline. Confirm fees, delivery and document-sharing arrangements in writing.

Request a quote

Ready to Get Started?

Share your plan link or request a quote today to receive a comprehensive, competitively priced electrical estimate.

Share This Page

Twitter Facebook LinkedIn Email