Our Quality Control Process

Every estimate undergoes two independent reviews before delivery. Here is exactly how we catch errors and ensure accuracy.

Dual-Review Process

Every estimate that leaves our office goes through a documented two-review process. This is not optional — it is built into our workflow and tracked in our project management system. No estimate is delivered until both the lead estimator and the quality assurance reviewer have signed off.

Review Stage 1: Lead Estimator Review

After the takeoff specialist completes the quantity survey, the lead estimator reviews the entire takeoff before pricing begins. This includes:

  • Verifying all quantities against the plan set
  • Checking that all addenda have been incorporated
  • Confirming scope coverage matches the specifications
  • Identifying any drawing-specification conflicts
  • Adjusting takeoff methodology for complex areas

Review Stage 2: Quality Assurance Review

After the lead estimator completes pricing and bid assembly, a second senior estimator performs an independent QA review:

  • Spot-checking quantities against the original plan set
  • Verifying material pricing against current supplier data
  • Reviewing labor unit selection for appropriate productivity factors
  • Checking mathematical accuracy of extensions and totals
  • Confirming overhead and profit percentages match agreed rates
  • Reviewing scope letter for clarity and completeness

What We Check in Every Estimate

Material Quantities

  • Device counts verified against plan set
  • Conduit and cable tray measurements confirmed
  • Fixture schedule quantities cross-checked
  • Panel schedule breaker counts verified
  • Spare capacity requirements included

Labor Calculations

  • NECA labor units applied correctly
  • Productivity factors appropriate for project type
  • Building height and site conditions factored
  • Union vs. open-shop rates applied
  • Overtime premiums where required

Pricing & Bid Assembly

  • Material pricing from current supplier data
  • Regional cost multipliers applied
  • Sales tax and delivery charges included
  • Overhead and profit verified
  • Scope letter accurately reflects inclusions

Error Tracking & Continuous Improvement

We track every error found during QA review in our internal system. Common issues — such as missed addenda items, miscounted devices on repetitive floor plans, or incorrect labor unit selection — are documented and used to improve our checklists and training materials. Our error rate has decreased consistently since we implemented this tracking system.

What This Means for You

When you receive an estimate from FK Electrical, you can be confident that:

  • Two experienced estimators have reviewed your project
  • Quantities have been verified against the original plan set
  • Pricing reflects current market conditions in your area
  • All addenda have been incorporated before pricing
  • The scope letter accurately represents what is and is not included

Experience the Difference Dual-Review Makes

Upload your plans and we'll put our two-review quality control process to work on your next bid.

Upload Your Plans

FK Electrical Estimating

Professional, Fast, and Pinpoint Accurate Electrical Estimations Nationwide.

📍 5900 Balcones Dr, Austin, TX 78731

📞 Phone: (317) 751-5969

✉️ Email: fandkestimations@gmail.com

Ready to Submit Your Next Bid?

Upload your plans and we'll deliver a complete Division 26 material takeoff, labor calculation, and bid-ready cost summary within 48 hours. Flat-fee pricing, no hidden charges.