Low Voltage Estimating Services

Request low-voltage takeoffs for structured cabling, fiber, fire alarm, CCTV, access control and audio-visual systems. Agree device counts, cable routing and the installation scope separately from vendor programming or commissioning.

Bid deliverable: Device and equipment schedules, cable quantities where routes are defined, and pathway assumptions organized by system. Identify missing cable routes and vendor-supplied items before pricing. Review published electrical takeoff samples →

Low Voltage Takeoff and Estimating

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

    Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

    📡

    Structured Cabling

    Cat6/6A, fiber optics, racks, patches & j-hook pathways.

    🔔

    Fire Alarm Takeoffs

    Initiating devices, notification appliances & panel risers.

    📹

    Security & CCTV

    Card readers, door strikes, cameras & NVR equipment.

    ⏱️

    Schedule confirmed after review

    Rapid response for low voltage bid packages and scopes.

    Systems Included in Our Low Voltage Takeoffs

    Define the pathways, cable drops, devices and vendor responsibilities to include in your low-voltage takeoff:

    ✓ Cat6, Cat6A, and single/multi-mode fiber optics
    ✓ Data drops, faceplates, keystone jacks & service loops
    ✓ Server racks, patch panels, horizontal/vertical cable mgmt
    ✓ J-hooks, cable trays, raceways & sleeve penetrations
    ✓ Smoke detectors, heat sensors, pulls, horn/strobes & NAC panels
    ✓ Access control boards, maglocks, strikes, sensors & power
    ✓ IP surveillance dome/bullet cameras, PoE switches & NVRs
    ✓ PA / paging speakers, 70V transformers & volume attenuators

    Low Voltage Deliverables

    📊

    Cable Run Schedule

    Footages calculated per drop with vertical riser heights and service loop allowances factored in.

    🎨

    Marked Floor Plans

    Color-coded PDF drawings clearly distinguishing data drops, CCTV cameras, and fire alarm points.

    📑

    Headend Equipment BOM

    Racks, patch panels, wire managers, and power distribution units (PDU) itemized for distribution.

    ⚡

    Labor Hours Summary

    Pulling, termination, labeling, and certification testing hours calculated separately.

    Define the low-voltage systems in your bid

    Keep communications, security and fire alarm quantities separate using the project specifications. A device count alone is not a complete installed system: identify cable routes, supports, terminations, headend equipment, testing and vendor responsibilities.

    Documents for a low-voltage quote

    Send system floor plans, risers, device and cable schedules, rack elevations, specifications and addenda. Provide the site city/state, current drawing revision, bid deadline and the systems you want included. Missing routes or ceiling heights require stated allowances or clarification.

    Agree the handoff between trades

    Confirm who supplies pathways, sleeves, firestopping, power supplies, network switches and active equipment. Separate field installation from programming, design, system certification and commissioning. For access control, identify door hardware, reader, lock power and integrator responsibilities.

    Coordinate electrical rough-in with the commercial electrical bid. Process plant controls belong in a separately agreed instrumentation and controls package.

    Request This Estimating Scope →

    Low-voltage system takeoff scope

    For structured cabling, communications, security, fire alarm, audiovisual, and related system bids. List each included system because low voltage is not one uniform package.

    Documents that define your estimate

    Communications and security plans, device legends, risers, rack elevations, cable specifications, manufacturer schedules, testing requirements, and the electrical/low-voltage responsibility matrix.

    Scope and measurement checklist
    Scope itemMeasurementSource to reconcileItem to clarify
    Devices and endpointsEA by system and typePlan symbols reconciled with device schedulesControllers, interfaces, power supplies, licenses, and accessories
    Copper and fiber cablingLF by cable typeMeasured routes, risers, endpoint and rack locationsDocument service-loop and slack assumptions separately
    Pathways and supportsLF/EA by typeTray, conduit, sleeves, supports, and shared-pathway detailsIdentify which pathways are provided by the electrical contractor
    Termination and testingEA endpoints; worker-hoursConnection counts and specified test/certification outputsProgramming and manufacturer commissioning are separate scope decisions

    Inclusions, exclusions, and responsibilities

    Confirm Division 27 communications and Division 28 safety/security responsibilities against the actual project manual. Do not presume that all fire alarm, suppression, controls, or networking work belongs to one contractor.

    Do cable counts alone establish a complete low-voltage estimate?

    No. Include pathways, supports, connectors, patching, rack hardware, labeling, testing, device power, interfaces, and any agreed programming or commissioning. Identify owner-furnished equipment separately.

    Confirm the fee and review deadline

    Send the project location, current drawing revision, included systems, required outputs, and bid deadline. The proposal should state the estimating fee, delivery date, price/labor assumptions, and revision terms before you authorize work.

    Inspect the published electrical takeoff samples for measured quantities and units. The commercial and multifamily excerpts illustrate selected electrical scope; they do not establish completed industrial or instrumentation assignments.

    ⚡

    FK Electrical Estimating

    Electrical takeoff and estimating inquiries for construction bids.

    📍 Remote project inquiries; availability confirmed when quoting

    📞 Phone: Call Estimating Desk

    ✉️ Email: info@fkelectricalestimatings.com

    Discuss your bid requirements

    Provide the project city and state, current drawing revision, scope and deadline. Confirm fees, delivery and document-sharing arrangements in writing.

    Request a quote

    Ready to Get Started?

    Share your plan link or request a quote today to receive a comprehensive, competitively priced electrical estimate.

    Share This Page

    Twitter Facebook LinkedIn Email